Service 02 · Sheet A-102

Bathroom Remodeling

The best bathroom work is the part you never see: the waterproofing, the slope, the venting.

BATHROOM REMODELINGA-102
ProjectBathroom RemodelingSheetA-102ByNovara C&D

Overview

Primary suites, hall baths and powder rooms — waterproofed properly, vented correctly and tiled with care.

A good bathroom is mostly invisible work — the waterproofing behind the tile, the slope of the shower floor, the ventilation that keeps moisture out of your walls. We get those details right first, then finish with the tile, glass and fixtures you will see every day.

From a powder-room refresh to a full primary suite, every bathroom we build starts with a written scope and a schedule you can plan around.

Why it matters

The details that make the difference.

  1. 01

    Built dry

    Waterproofing and venting done right behind the walls, where it matters most.

  2. 02

    Planned tile

    Layouts set out before the first tile goes down, so cuts land clean and grout lines line up.

  3. 03

    Safer spaces

    Grab-bar blocking, low-threshold showers and slip-resistant finishes on request.

How it runs

From walkthrough to handover.

Every bathroom remodeling project follows the same five steps — so you always know what comes next.

  1. 01

    Walkthrough

    We visit the site, listen to what you want, take measurements and talk honestly about budget and options.

    You getFree on-site consultation

  2. 02

    Written estimate

    You receive an itemized estimate with the scope, allowances and assumptions spelled out line by line.

    You getItemized proposal

  3. 03

    Plan & permits

    We finalize scope, selections and a dated schedule, sign the contract and file the permits.

    You getContract & dated schedule

  4. 04

    Build

    Your point of contact runs the site, coordinates every trade and keeps you updated every week.

    You getWeekly progress updates

  5. 05

    Final walkthrough

    We walk every room together, close the punch list and hand over a finished, inspected project.

    You getClosed punch list

Questions

Questions, answered.

Have a question that isn’t here? Call us — we’re glad to talk it through.

How long does a bathroom remodel take?

Scope drives the timeline. A straightforward refresh is quicker than a full gut with relocated plumbing. Your estimate includes a dated schedule, and we confirm tile and fixtures are on hand before demolition starts.

Can you convert a tub into a walk-in shower?

Yes. Tub-to-shower conversions are a popular upgrade, including low-threshold and curbless options where the floor framing allows.

Do I need a permit for a bathroom remodel?

Often — especially when plumbing or electrical work is involved. We will tell you exactly what your project requires and handle the filing and inspections.

Free walkthrough · Written estimate

Planning a bathroom project?

Tell us what you’re planning. We’ll set up a free walkthrough and put an itemized estimate in your hands — no pressure, no obligation.

Get a free estimate Or call(973) 800-6147

We respond within one business day.

Call nowFree estimate