Service 01 · Sheet A-101

Kitchen Remodeling

The hardest-working room in the house deserves a plan before the first cabinet comes off the wall.

KITCHEN REMODELINGA-101
ProjectKitchen RemodelingSheetA-101ByNovara C&D

Overview

Layouts that work and finishes that last — cabinets, counters and tile, plus the plumbing, electrical and ventilation behind them.

A kitchen packs more trades into less space than any other room. We plan the sequence before demolition starts, so plumbers, electricians, cabinet installers and tile setters arrive in the right order — and your kitchen is out of commission for as short a time as possible.

Whether you are replacing finishes or moving walls to open up the floor plan, you get a written, itemized scope up front and one person to call with questions.

Why it matters

The details that make the difference.

  1. 01

    A planned sequence

    Trades scheduled in order and long-lead items ordered early, so work never stalls waiting on the next crew.

  2. 02

    A protected home

    Dust barriers, floor protection and daily clean-up keep the rest of your house livable.

  3. 03

    Clear selections

    Allowances and finish selections spelled out in writing, so choices never turn into surprise costs.

How it runs

From walkthrough to handover.

Every kitchen remodeling project follows the same five steps — so you always know what comes next.

  1. 01

    Walkthrough

    We visit the site, listen to what you want, take measurements and talk honestly about budget and options.

    You getFree on-site consultation

  2. 02

    Written estimate

    You receive an itemized estimate with the scope, allowances and assumptions spelled out line by line.

    You getItemized proposal

  3. 03

    Plan & permits

    We finalize scope, selections and a dated schedule, sign the contract and file the permits.

    You getContract & dated schedule

  4. 04

    Build

    Your point of contact runs the site, coordinates every trade and keeps you updated every week.

    You getWeekly progress updates

  5. 05

    Final walkthrough

    We walk every room together, close the punch list and hand over a finished, inspected project.

    You getClosed punch list

Questions

Questions, answered.

Have a question that isn’t here? Call us — we’re glad to talk it through.

How long does a kitchen remodel take?

It depends on scope — a finish-level refresh moves much faster than a layout change with new plumbing and electrical. Your estimate includes a dated schedule, and we order long-lead items like cabinets before demolition so your kitchen is never torn out while we wait.

Can we stay in the house during the remodel?

Usually, yes. We set up dust protection, keep a clean path through the house and clean up every day. We will talk through a temporary kitchen setup during the walkthrough.

Do you handle permits?

Yes. When a kitchen remodel needs permits — typically for plumbing, electrical or structural changes — we file them and schedule the inspections.

Free walkthrough · Written estimate

Planning a kitchen project?

Tell us what you’re planning. We’ll set up a free walkthrough and put an itemized estimate in your hands — no pressure, no obligation.

Get a free estimate Or call(973) 800-6147

We respond within one business day.

Call nowFree estimate